Replace 6 Oldest Boys' Cabins with 3 Cabins of the New Design
-
Remove the oldest 6 boys' cabins (all except Eagles' Nest).
-
Construct 3 new boys' cabins using the same design as the girls' cabin constructed in Phase 1.
-
Repurpose Eagles' Nest cabin into Staff quarters
Remodel & re-purpose the old two-story Staff Bunkhouse
-
Repurpose the lower floor into a new Canteen and Camp Store.
-
Repurpose the upper floor into either storage for the camp store or some other purpose.
-
Construct a racquetball court and/or a boulder wall adjacent to the two-story side of the building.